<div dir="ltr">Hi all,<div><br></div><div>I have summarized the battery storage cost projection of NREL ATB 2020 as attached. </div><div>It would be great if you could skim it before our regular meeting. </div><div><br></div><div>Based on their scenario description, Moderate scenario seems appropriate as the base case scenario of SWITCH. Costs in Moderate scenario is about 2/3 of current SWITCH model. It is partly because of the difference in lifetime (ATB assumes 15 years, while SWITCH assumes 10 years.)</div><div><br></div><div>The costs inputs of RESOLVE are much lower than those in Advanced scenarios of ATB. I would like to talk about the units of the cost inputs in the next meeting.</div><div><br></div><div>Best regards,</div><div>Kenji</div><div><br clear="all"><div><div dir="ltr" class="gmail_signature" data-smartmail="gmail_signature"><div dir="ltr"><div><div dir="ltr"><div>---<br>Kenji Shiraishi<br><br>Researcher,<br>Renewable and Appropriate Energy Laboratory (RAEL)<br>450 Sutardja Dai Hall<br>Ph.D. student, Goldman School of Public Policy (GSPP)<br>University of California, Berkeley<br><br><a href="https://rael.berkeley.edu/people/shiraishi-kenji/" target="_blank">https://rael.berkeley.edu/people/shiraishi-kenji/</a></div><div><a href="https://www.kenjishiraishi.com/" target="_blank">https://www.kenjishiraishi.com/</a><br></div></div></div></div></div></div></div></div>